Case Study

Reducing effluent streams for aquaculture processing.

One of the big issues with waste management in the fisheries industry is bacteria management and infrastructure fouling and equipment required due to high chemical treatment of waste.

 

Project goals:

  • To reduce bacteria to 0% pass-through rate

  • Reduce the amount of pipe fouling, holding tanks and spray nozzles required

Results:

  • 99% TSS reduction

  • 45% BOD reduction

  • 45% COD reduction

  • Smaller reductions in total nitrogen

  • 100% reduction in fecal coliforms E.coli and listeria in the waste stream

  • No bacteria pass-through

  • No more pipe fouling

  • Full scale system payback estimated after 2 years